Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Silicon Envelope for the Large Protoype TPC, Page 1 of 2  Not logged in ELOG logo
ID Date Author Type Subjectup Text Attachments
  3   Fri Feb 27 13:34:11 2009 Stephan HänselMeasurementsARCs Noise PIoff + channels 2 repair 
 NoisePlot.png 
  15   Tue Nov 3 11:18:46 2009 Stephan HänselSetupBeam Offclose shutter:

    close shutter T24/1 with
the button "Beam  Shutter zu"
  
  14   Tue Nov 3 10:45:01 2009 Stephan HänselSetupBeam Onclear test beam areas:
go to T24 (front area):

    use (red) key from interlock
  
  12   Mon Nov 2 13:22:50 2009 Stephan HänselSetupDAQstart data-taking:
ssh xxx@bastion.desy.de -X
ssh xdaq@flctpcikhero1.desy.de -X
  
  5   Thu Oct 22 08:02:26 2009 Stephan HänselSetupElectronicsHV-Kapton-PIN-assignment

  
  
  1   Wed Oct 1 11:42:44 2008 stephan hänselSetupModulkomponentenMODULE 0
1 Sensor Module (SiLC01):
   Hybrid: TEC_6D.2.1 /
  
  7   Thu Oct 22 11:18:34 2009 Stephan HänselSetupPicturesPhoto
Gallery
zusätliche Photos:
  
  8   Fri Oct 23 07:52:52 2009 Stephan HänselMeasurementsRun 11269 - Pedestal RunB=0, TPC inbetween but no TPC readout   
  9   Fri Oct 23 07:57:01 2009 Stephan HänselMeasurementsRun 11270 - latency scanB=0, TPC inbetween but no TPC readout
scan from 70 to 120 with 1000 events
each
  
  10   Fri Oct 23 08:02:57 2009 Stephan HänselMeasurementsRun 11271 - position runB=0, TPC inbetween but no TPC readout
Beam: 3GeV
moved silicon to center position
  
  11   Fri Oct 23 08:09:04 2009 Stephan HänselMeasurementsRun 11273 - dataB=0, TPC inbetween but no TPC readout
Beam: 3GeV
silicon position from TPC-support-ring: 
  
  16   Wed Nov 4 15:29:00 2009 Stephan HänselMeasurementsRun 20055 - Pedestal    
  17   Wed Nov 4 15:31:39 2009 Stephan HänselMeasurementsRun 20055 - Pedestal15399 triggers
HV: 200V -> 2µA
LV: 
  
  18   Wed Nov 4 16:10:24 2009 Stephan HänselMeasurementsRun 20056 - Micromegas #80510989 events
HV: 200V -> 2µA
LV:
  
  19   Wed Nov 4 16:12:33 2009 Stephan HänselMeasurementsRun 20057 - Micromegas #8061076 events
trigger rate 7,25Hz
bx = real trigger number
  
  20   Wed Nov 4 16:31:42 2009 Stephan HänselMeasurementsRun 20059 - Micromegas #807crashed at 3648 events -> TPC got much
more events
Beam: 5,6 GeV
  
  21   Wed Nov 4 17:12:47 2009 Stephan HänselMeasurementsRun 20061 - Latency Scan -> 70LATENCY IS SET TO 70
spillsize = 500
 
  
  22   Wed Nov 4 18:19:44 2009 Stephan HänselMeasurementsRun 20062 - data6493 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
  
  23   Wed Nov 4 18:24:48 2009 Stephan HänselMeasurementsRun 20063 - Micromegas #808crashed at 18577 events - TPC 19220 events
Beam: 5,6 GeV
one Micromegas module in center position
  
  24   Thu Nov 5 19:33:53 2009 Stephan HänselMeasurementsRun 20064 - pedestal12199 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
  
ELOG V3.1.5-fc6679b