Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Silicon Envelope for the Large Protoype TPC  Not logged in ELOG logo
Message ID: 28     Entry time: Thu Nov 5 19:46:15 2009
Author: Stephan Hänsel 
Type: Measurements 
Subject: Run 20073 - Micromegas 815 

10070 events

with 2 Micromegas modules (TPCDAQ stopped at 9864 events)

Beam: 5,6 GeV

silicon sledge 35cm inside from TPC-support-front and 36mm above center position

  • -> front Z: 5mm too far inside the gap
  • -> back Z: 5mm too far outside the gap

 

HV: 200V -> 1,2µA

LV:

  • 01,30 / 02,60   //   01.30 / 02.60
  • 0,632 / 1,739   //   0,622 / 1,752

 

 

 

Attachment 1: OneTrackEvents_020073.txt  15 kB  Uploaded Mon Jan 11 15:55:36 2010  | Show | Hide all | Show all
Attachment 2: TwoTrackEvents_020073.txt  261 Bytes  Uploaded Mon Jan 11 15:55:53 2010  | Hide | Hide all | Show all
30
57
484
514
677
763
848
1068
1156
1215
1296
1392
1676
2009
2502
2575
2701
2703
2778
3033
3300
3952
3969
4116
4242
4416
4439
4949
4998
5043
5185
5353
5451
5575
5584
5754
5932
6549
6967
7135
7368
7400
7879
7994
8247
8377
8690
8968
9606
9742
9772
9801
9915
9938
ELOG V3.1.5-fc6679b