ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
45
|
Fri Aug 21 12:05:31 2009 |
Christian Irmler | BELLE | APVDAQ standalone 40 MHz hit mode | run006 | interrupted | 21.08.2009 10:41:51 | 21.08.2009 10:54:37 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
table position y (height): 94.3
zero supressed w/o bad strip definition of origami module
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
|
46
|
Fri Aug 21 12:06:06 2009 |
Christian Irmler | BELLE | APVDAQ standalone 40 MHz | run007 | interrupted | 21.08.2009 11:06:45 | 21.08.2009 11:10:40 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
zero supressed w bad strip definition of origami module, but reverse readout order of APV 2 and 3 on p-side |
103
|
Tue Aug 25 20:21:31 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode | run042 | 85189 | 25.08.2009 20:18:18 | 26.08.2009 01:27:12 |
Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
no cooling
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
29
|
Thu Aug 20 12:50:59 2009 |
Christian Irmler | alignment_beam | bottom right on sensor, point 4 | run6866 | 8467 | 20.08.2009 12:51:04 | 20.08.2009 13:05:01 |
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:43 y:155 (bottom right on sensor in beam direction) |
43
|
Fri Aug 21 06:31:29 2009 |
Christian Irmler | BELLE | APVDAQ + telescope | run6873 | 80173 | 21.08.2009 00:47:38 | 21.08.2009 06:07:02 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
run interrupted after 80173 --> bad timing, peak was at 4 th or 5 th sample |
60
|
Sat Aug 22 03:27:13 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz transparent mode (cooling?) | run014 | 75k | 22.08.2009 03:25:23 | 22.08.2009 07:08:09 |
HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples
chiller set to 13 deg.
f=31.8 MHz
config file: cern09_belle_31.8mhz_multi6.cfg
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated
|
61
|
Sat Aug 22 08:32:02 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run015 | 75k | 22.08.2009 08:15:05 | 22.08.2009 09:25:21 |
HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller set to 13 deg.
f=31.8 MHz
config file: cern09_belle_31.8mhz_hit_multi6.cfg
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated
|
62
|
Sat Aug 22 09:44:50 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run016 | 75k | 22.08.2009 09:42:38 | 22.08.2009 10:24:05 |
HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller set to 13 deg.
f=31.8 MHz
config file: cern09_belle_31.8mhz_hit_cut5_multi6.cfg
there was probably no water flow throught the pipe of the origami module during this run!
|
63
|
Sat Aug 22 10:28:50 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 40 MHz hit mode (cooling?) | run017 | 75k | 22.08.2009 10:26:28 | 22.08.2009 11:16:12 |
HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller set to 13 deg.
f=40 MHz
config file: cern09_belle_hit_multi6.cfg
there was probably no water flow throught the pipe of the origami module during this run!
|
64
|
Sat Aug 22 11:26:00 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 40 MHz hit mode (cooling?) | run018 | 75k | 22.08.2009 11:16:57 | 22.08.2009 11:58:56 |
HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller set to 13 deg.
f=40 MHz
config file: cern09_belle_hit_cut5_multi6.cfg
trigger rate about 3500 ev / spill
there was probably no water flow throught the pipe of the origami module during this run!
|
73
|
Sat Aug 22 15:52:33 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run019 | 75k | 22.08.2009 15:50:40 | 22.08.2009 19:14:21 |
Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg, 2900 rpm
water flow checked befor start of run |
74
|
Sat Aug 22 19:19:20 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run020 | 75k | 22.08.2009 19:17:29 | 22.08.2009 22:09:53 |
Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg, 2900 rpm
water flow checked befor start of run |
44
|
Fri Aug 21 06:34:39 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz | run005 | 75000 | 21.08.2009 06:10:41 | 21.08.2009 10:37:33 |
was originally run004, renamed after run was stopped to avoid duplicate names
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
table position y (height): 94.3
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
same as run6873, but w improved timing --> peak is now at sample 2 or 3
since eudetmac was not reachable by VNC, the telescope has not been restarted !
|
47
|
Fri Aug 21 12:06:29 2009 |
Christian Irmler | BELLE | APVDAQ standalone hit mode 40 MHz | run008 | 75000 | 21.08.2009 11:15:09 | 21.08.2009 11:29:53 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
same as run6873, but w improved timing --> peak is now at sample 2 or 3
since eudetmac was not reachable by VNC, the telescope has not been restarted !
zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side
hit cut = 4 |
48
|
Fri Aug 21 12:06:39 2009 |
Christian Irmler | BELLE | APVDAQ standalone hit mode 40 MHz | run009 | 75000 | 21.08.2009 11:48:22 | 21.08.2009 12:01:53 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
same as run6873, but w improved timing --> peak is now at sample 2 or 3
since eudetmac was not reachable by VNC, the telescope has not been restarted !
zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side
hit cut = 5 |
50
|
Fri Aug 21 12:22:43 2009 |
Christian Irmler | BELLE | APVDAQ standalone 31.8 MHz hit mode | run010 | 75000 | 21.08.2009 12:53:02 | 21.08.2009 13:35:01 |
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
switched to external clock source
processed mode, hit cut = 4
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) |
51
|
Fri Aug 21 13:38:20 2009 |
Christian Irmler | BELLE | APVDAQ standalone 31.8 MHz hit mode | run011 | 75000 | 21.08.2009 13:35:25 | |
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
processed mode, hit cut = 5
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) |
59
|
Sat Aug 22 01:06:34 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode (cooling?) | run013 | 75000 | 21.08.2009 23:49:38 | 22.08.2009 03:21:48 |
Belle DUT, tranparent mode
HV=80V, 40 MHz, beam on, 120 GeV
6 samples
chiller set to 13 deg.
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
APVDAQ and telescope runs are not synchronized
trigger rate: about 300 - 500 ev / spill
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated |
31
|
Thu Aug 20 15:15:33 2009 |
Christian Irmler | alignment_beam | bottom center on sensor, point 6 | run6869 | 615 (beam manipulation by students) | 20.08.2009 14:56:16 | 20.08.2009 15:14:11 |
2 alignment modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:50 y:155 (bottom center on sensor in beam direction) |
57
|
Fri Aug 21 18:35:13 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode | run012 | 60000 | 21.08.2009 18:31:01 | 21.08.2009 23:25:03 |
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
transparent mode
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
APVDAQ and telescope runs are not synchronized |