Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Testbeam at DESY in 2023  Not logged in ELOG logo
Message ID: 320     Entry time: Tue Jul 11 18:14:25 2023
Author: tb-crew 
Subject: first proper tests 
Run Number:  
DUT: RD50-MPW3 
Wafer: unknown 
HV: 91 
Fluence: unirradiated 
Resistivity: 1.9K 
Beam Energy: 4.2 
Rate Setting: Low Flux Low 
Particle Type: electron 
Data: Unknown 
t-Start:  
t-Stop:  
Duration_min:  
scanned position with XY stage, seems to be centered with small collimator now
ELOG V3.1.5-fc6679b